Egypt: New Suez Canal To Increase Revenues To $15 Billion By 2023 And Reduce Navigation Time From 22 to 11 Hours

The New Suez Canal project is more than 80% complete with more than 210m tons of sand excavated, so our attention is now turning to the celebration of this achievement with the Egyptian people, as well as sharing news of Egypt’s ‘gift to the world’ far and wide,said Admiral Mohab Mameesh, SCA’s Chairman and Managing Director.

  • Français:

L’Autorité du canal de Suez (ACS) a annoncé, en date du 15/06/2015, le lancement des célébrations du nouveau canal de Suez, qui culmineront avec son inauguration le 6 août 2015 par le président égyptien Abdel Fattah El-Sisi.

Les célébrations et la campagne mondiale de communication seront supervisées par l’ACS et appliquées par un consortium comprenant WPP, une des plus grandes compagnies de communication marketing, ainsi qu’un nombre d’entreprises égyptiennes. Team WPP est dirigé par Memac Ogilvy & Mather, avec le soutien de Memac Ogilvy Public Relations, Media Waves, Emeco Travel, JWT, Richard Attias et Mindshare.

« Le nouveau canal de Suez est bien plus qu’une nouvelle voie de navigation et un joyau d’ingénierie. C’est un catalyseur pour le peuple égyptien, une nouvelle source de fierté et la promesse d’un avenir plus prospère », a expliqué l’amiral Mohab Mameesh, président et directeur général de l’ACS.

Il a ajouté : « Le projet est à plus de 80% achevé, et ce pourcentage augmente toujours, avec plus de 210 millions de tonnes de sable creusés. C’est pourquoi notre attention se tourne actuellement à la célébration de ces réalisations avec le peuple égyptien en partageant en même temps en long et en large les nouvelles de ce cadeau de l’Egypte au monde ».

EMerging Equity

Egypt’s New Suez Canal will open later this year on August 6. President Abdel Fattah al-Sisi sees the project as a symbol of national pride and a chance to stimulate an economy, Reuters reports. 

Suez Canal Map

The Egyptian army “began work 10 months ago on the $8 billion canal, flanking the existing, historic 145-year-old waterway and part of a larger undertaking to expand trade along the fastest shipping route between Europe and Asia,” according to the news agency.

The digging and dredging works will conclude on July 15. The opening of the New Suez Canal will be on Aug. 6, according to the orders of the Egyptian people and the Egyptian president,” Mohab Mameesh, chairman and managing director of the Suez Canal Authority said.

He also added that “once President al-Sisi orders the start of navigation on Aug. 6, ships will be able to go through the…

View original post 246 more words

Advertisements

Thank you for your contribution

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out / Change )

Twitter picture

You are commenting using your Twitter account. Log Out / Change )

Facebook photo

You are commenting using your Facebook account. Log Out / Change )

Google+ photo

You are commenting using your Google+ account. Log Out / Change )

Connecting to %s